Scottish Trunk Road Network Maintenance Contract - North West Unit

GreatbritainTenders notice for Scottish Trunk Road Network Maintenance Contract - North West Unit. The reference ID of the tender is 114201131 and it is closing on 14 Feb 2025.

100% Secure Payments

Tender Details

  • Country: United Kingdom
  • Summary: Scottish Trunk Road Network Maintenance Contract - North West Unit
  • GBT Ref No: 114201131
  • Deadline: 14 Feb 2025
  • Competition: ICB
  • Financier: Self Financed
  • Purchaser Ownership: Public
  • Tender Value: Refer Document
  • Notice Type: Tender
  • Document Ref. No.: FEB523088
  • Purchaser's Detail :
  • Purchaser : BEAR SCOTLAND LIMITED
    United Kingdom Of Great Britain And Northern Ireland
    [Disclaimer : For Exact Organization/Tendering Authority details, please refer the tender notice.]
    Email :mgodsell@bearscotland.co.uk

  • Description :
  • The focus of the Cromarty Bridge Phase 3 Refurbishment works is to minimise traffic disruption.All works above deck will be completed at night or during weekends for specific tasks.Permanent WorksThe refurbishment permanent works are as follows:1. Replace bridge bearings at piers 8, 9 and 10.2. Removal and replacement of surfacing and waterproofing local to bridge joints at piers 8,9 and 10. Note, the existing waterproofing is bitumen based and contains ChrysotileAsbestos.3. Excavation and installation of continuity joints on piers 8 and 9 to form a three-spancontinuous deck module.4. Replace gullies adjacent to the bridge joints at piers 8, 9 and 10.5. Replace expansion joint at pier 10.6. Concrete repairs as required to the substructure at piers 8, 9 and 10.7. Install Cathodic Protection system on piers 8, 9 and 10 (above and below the bridgedeck).8. Apply Pavix CCC100 or similar approved to pre-stressed beams on spans 9, 10 and 11.9. Sever dowel bars after new bearings have been installed and the continuity slabs haveachieved 85% of specified compressive strength.Temporary WorksThe Sub-Contractor shall include the cost of all temporary works within in the permanent worksrates. As a minimum, these will include the following:1. The topside works on the bridge deck will be completed by installing temporary bridgingplates to allow traffic to flow in both directions with a 30mph speed restriction from 0600 to1900. At night (1900 to 0600), the temporary bridging plates will be r...
  • Documents :
  •  Tender Notice

If you are registered member, kindly login to view full details of this tender notice:

CLICK HERE TO LOGIN
GreatbritainTenders Features

GreatbritainTenders Features

Fresh and verified Tenders from Greatbritain. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • Accurate Tender Information
  • New Tenders Every Day
  • Consultants for RFI/RFP/RFQ
  • Search, sort, and filter Tenders
  • Customer Support
  • Publish your Tenders
  • Consulting Services
  • Export data to Excel or CRM

Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting ZimbabweTenders !!
Email Id is already exist !!
Invalid Captcha !

Get FREE SAMPLE TENDERS from Greatbritain in your email inbox.

  Chat with us