Future Notice: Design of a Connector to Feed Renewable Power in to the Traction System

GreatbritainTenders notice for Future Notice: Design of a Connector to Feed Renewable Power in to the Traction System. The reference ID of the tender is 78896499 and it is closing on 26 Jan 2024.

100% Secure Payments

Tender Details

  • Country: United Kingdom
  • Summary: Future Notice: Design of a Connector to Feed Renewable Power in to the Traction System
  • GBT Ref No: 78896499
  • Deadline: 26 Jan 2024
  • Competition: ICB
  • Financier: Self Financed
  • Purchaser Ownership: Public
  • Tender Value: Refer Document
  • Notice Type: Tender
  • Document Ref. No.: JAN425523
  • Purchaser's Detail :
  • Purchaser : NETWORK RAIL INFRASTRUCTURE LTD
    Network Rail Infrastructure Ltd
    1 Eversholt Street
    London
    NW1 2DN
    UK
    Telephone : +44 1908781000
    E-mail : Nikki.Hunter@networkrail.co.uk
    NUTS : UK
    Internet address(es)
    Main address : https : //networkrail.bravosolution.co.uk/

    Email :Nikki.Hunter@networkrail.co.uk
    URL :https://networkrail.bravosolution.co.uk/

  • Description :
  • Network Rail operates, maintains and develops Britain's rail tracks, signalling, bridges, tunnels, level crossings and many key stations. As a result, Network Rail is one of the largest purchasers of electricity in the United Kingdom with a total consumption of c.4.5 TWh per annum (traction 4.1 TWh and non-traction 0.45 TWh).

    Title: Design of a Connector to feed renewable power in to the traction system
    OCID: ocds-h6vhtk-039a99
    Published by: Network Rail Infrastructure Ltd
    Authority ID: AA73642
    Publication Date: 26/01/2023
    Deadline Date:
    Deadline Time:
    Notice Type: Prior Information Notice
    Has Documents: No
    Has SPD: No
    Abstract: Network Rail operates, maintains and develops Britain's rail tracks, signalling, bridges, tunnels, level crossings and many key stations. As a result, Network Rail is one of the largest purchasers of electricity in the United Kingdom with a total consumption of c.4.5 TWh per annum (traction 4.1 TWh and non-traction 0.45 TWh). His Majesty's Government has made legal commitments to reduce greenhouse gas emissions to net zero by 2050. Network Rail has committed to support this objective and move our electricity supply to renewable energy.Network Rail would like to explore opportunities for the direct supply of renewable power ‘behind the meter-, with the renewable energy generators, and with a direct connection to Network Rail-s infrastructure. To support this objective, Network Rail is seekin...
    [Disclaimer: This is Prior Information Notice so no specific deadline was given hence we have added 1 year from the date of posting.]
  • Documents :
  •  Tender Notice

If you are registered member, kindly login to view full details of this tender notice:

CLICK HERE TO LOGIN
GreatbritainTenders Features

GreatbritainTenders Features

Fresh and verified Tenders from Greatbritain. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • Accurate Tender Information
  • New Tenders Every Day
  • Consultants for RFI/RFP/RFQ
  • Search, sort, and filter Tenders
  • Customer Support
  • Publish your Tenders
  • Consulting Services
  • Export data to Excel or CRM

Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting ZimbabweTenders !!
Email Id is already exist !!
Invalid Captcha !

Get FREE SAMPLE TENDERS from Greatbritain in your email inbox.

  Chat with us